A product can look perfect and still fail on the first day of use. Testing before shipment checks the things that matter to your customers and to regulators: that the product works, that it is safe, and that it will survive the journey to Zimbabwe.
On-site tests during inspection
Many tests can be done in the factory during a pre-shipment inspection, using the factory's equipment under our inspector's supervision or our own tools:
- Function tests: every sampled unit is switched on and used as a customer would use it.
- Electrical safety: earth continuity and high-voltage (hi-pot) tests on mains-powered appliances.
- Dimensions and weight: measured against the specification and the packing list.
- Carton drop test: packed cartons dropped from a defined height to check the packaging protects the goods.
- Labelling and markings: ratings plates, warnings, barcodes and shipping marks checked against the order.
Laboratory tests
Some properties can only be proven in an accredited laboratory, for example the composition of materials, battery safety, electromagnetic compatibility or chemical content of products that touch skin or food. Laboratory reports are also often required for certification. We arrange sample collection and send samples to a qualified laboratory, so the sample tested is the sample taken from your production, not one the supplier prepared separately.
Common tests by product
| Product | Typical tests |
|---|---|
| Household appliances | Function, hi-pot, earth continuity, power input, IEC 60335 series requirements |
| Solar panels and inverters | Rated output check, visual defects, insulation, labels, packaging strength |
| Lithium batteries | Capacity, protection circuit, IEC 62133 test reports, transport documents |
| Textiles and garments | Measurements, colour fastness, fabric weight, seam strength |
| Hardware and building materials | Dimensions, thickness, coating, load or pressure tests where specified |
When a test fails
A failed test is useful information, not the end of the order. Our report states which units failed and why, so you can require rework, replacement or a price adjustment while your balance payment is still in your hands. That leverage disappears once the goods have shipped.
From our recent post-production inspections
Photos from Africa Opal inspections after production and before dispatch. See more on our Field Work page.




- International Electrotechnical Commission (IEC 60335 and IEC 62133 series)
- Standards Association of Zimbabwe
This article is general guidance, not legal or customs advice. Rules change; confirm requirements for your product before you order.